Instructions for installation and construction of curtains

Procedure of Construction & Installation of PAC Curtains: Steps

PLASTIC GUIDE :
We assemble the plastic guides in the desirable dimension and we cut the last driver as needed.

PVC STRIPS
We cut the strips in the desirable length

PIERCINGS OF THE STRIPS
We pierce the strips using the patron, the appropriate accessory (10 mm) and a hammer.

INSTALLATION OF THE PLASTIC GUIDES

We screw the plastic guide on the upper part of the door, in the internal part of the cold room (if we wish in the roof).

We join the second driver to the first with the special slot. We repeat the above procedure for every plastic guide.

INSTALLATION OF THE PVC CURTAINS

We place the curtain beginning from the first hook.

We place the next pvc curtain using also the last hook of the previous, in order to have overlapping.

We continue this process until we place all the curtains.

WE ADJUST THE HEIGHT OF THE CURTAIN

Due to the fact that the pvc curtains are wrapped in their packaging, when we place them, they need 24 hours to flatten, namely to align completely and take their final format.

After the 24 hours we check the height of the pvc curtains and we cut as needed.

In that occasion, we unhook the curtains and using a slitter or a scissor we cut them in the desirable height (appropriate distance from the floor 2 mm).

INSTALLATION VIDEO: